Quantcast
Channel: Stack2RSS Custom Feed
Viewing all articles
Browse latest Browse all 11992

Path based signalling with dual-sided stations

$
0
0
Answers: 1
Accepted answer: no

I have just been introduced to Path Based Signalling (referred to as PBS) by a friend, and no matter how much I read I can't seem to figure out how to get a station to work properly which has trains coming in from both sides.

I have ended up with using Path Signal behind each platform entrance to 'terminate' the reserved train paths to allow other trains to reserve a path across the signal block. I have included a screenshot to better illustrate my current way of working with these new signals.

I have circled the One-Way Path Signals to highlight them.

OpenTTD dual-sided PBS station

As you can see, this setup works okay as the first trains reserved path is terminated allowing the second train (grain/livestock) to enter the station.

I'd like to know is this optimal, or even correct usage of these signals?


Viewing all articles
Browse latest Browse all 11992

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>